03.2 · CM at Risk
Pre-con collaboration. A number you can hold us to.
Who it's for
Sponsors and owners who want pre-construction input on cost and constructability before the design is locked, and a guaranteed price they can carry to the IC. Best fit for value-add repositioning, ground-up retail, and complex TIs where cost certainty matters earlier than a hard-bid GC can deliver it.
Deliverables
- —Pre-construction services agreement
- —Constructability & value-engineering input
- —Cost models & trade-by-trade estimates
- —GMP proposal & conversion to construction
- —Open-book accounting through delivery
- —Shared savings model against the GMP
- —Single team across pre-con and construction
What we run
We engage in pre-con to validate design, cost, and schedule. At an agreed gate we convert to a guaranteed maximum price and assume the cost risk. Open-book accounting through delivery. Savings against the GMP are shared per the contract.
Pre-construction transparency. Construction-phase certainty. One team across the gate.
GMP
guaranteed max price · risk we carry
Open
book accounting through delivery
Shared
savings model · aligned incentives